Validate: WireGuard/UDP connectivity at each site (D2) #1536

Open
opened 2026-08-13 23:22:54 +00:00 by ginjiruu · 2 comments
Owner

Validate: WireGuard/UDP connectivity at each site (D2)

Validation ticket for the hub architecture (#1532, decision D2). Confirms the assumption that WireGuard/UDP works at every current target site before the mesh is built on it.

Assumption being validated

D2 currently states: assumption — WG/UDP works at all current target sites (recorded in #1532). This ticket turns that assumption into a per-site checklist. If a site turns out TCP-egress-only, revisit (frp/rathole for L4, UDP-over-TCP shim or an L3 alternative for ClusterMesh).

Sites

  • portable (hub — public IP, own endpoint, no dial needed)
  • mini (spoke)
  • think (spoke — hosts 01–07, via the machine-configs cluster)
  • epsilon (spoke — single node)
  • the firewalled cluster (incoming; the reason this whole tunnel story exists)
  • any future site as it joins

What to verify per site

  • Can the site's node(s) reach the hub's public WG endpoint over UDP (outbound)? Test from the actual network the site will dial from, not the lab LAN.
  • Is UDP/51820 (or chosen WG port) allowed through the site firewall/NAT without ALG mangling?
  • Does a site NAT need a stable outbound port or is outbound ephemeral sufficient (hub-side requires the spoke to keep a persistent tunnel — PersistentKeepalive)?
  • NAT type (full-cone vs symmetric) — symmetric NAT affects spoke-to-spoke via hub relay.
  • Record the result per site in a comment on #1532 D2 or here.

Deliverables

  • Per-site WG/UDP validation recorded
  • D2 confirmed for all current sites, or a documented fallback chosen for any that fail
  • Address plan (#1533) updated with any site-specific transport constraints
  • #1532 (plan, D2)
  • #1533 (network plan — consumes the transport reality per site)
  • machine-configs docs/architecture-requirements.md R4/R5 (WG peer + tunnel client)
## Validate: WireGuard/UDP connectivity at each site (D2) Validation ticket for the hub architecture (#1532, decision D2). Confirms the assumption that WireGuard/UDP works at every current target site before the mesh is built on it. ## Assumption being validated D2 currently states: **assumption — WG/UDP works at all current target sites** (recorded in #1532). This ticket turns that assumption into a per-site checklist. If a site turns out TCP-egress-only, revisit (frp/rathole for L4, UDP-over-TCP shim or an L3 alternative for ClusterMesh). ## Sites - portable (hub — public IP, own endpoint, no dial needed) - mini (spoke) - think (spoke — hosts 01–07, via the machine-configs cluster) - epsilon (spoke — single node) - the firewalled cluster (incoming; the reason this whole tunnel story exists) - any future site as it joins ## What to verify per site - [ ] Can the site's node(s) reach the hub's public WG endpoint over UDP (outbound)? Test from the actual network the site will dial from, not the lab LAN. - [ ] Is UDP/51820 (or chosen WG port) allowed through the site firewall/NAT without ALG mangling? - [ ] Does a site NAT need a stable outbound port or is outbound ephemeral sufficient (hub-side requires the spoke to keep a persistent tunnel — `PersistentKeepalive`)? - [ ] NAT type (full-cone vs symmetric) — symmetric NAT affects spoke-to-spoke via hub relay. - [ ] Record the result per site in a comment on #1532 D2 or here. ## Deliverables - [ ] Per-site WG/UDP validation recorded - [ ] D2 confirmed for all current sites, or a documented fallback chosen for any that fail - [ ] Address plan (#1533) updated with any site-specific transport constraints ## Related - #1532 (plan, D2) - #1533 (network plan — consumes the transport reality per site) - machine-configs `docs/architecture-requirements.md` R4/R5 (WG peer + tunnel client)
Author
Owner

Closing as superseded by lab/iac ADR-0008: cross-site transport is NetBird (lab/iac#77), so there is no hand-built WireGuard hub left to validate.

Closing as superseded by lab/iac ADR-0008: cross-site transport is NetBird (lab/iac#77), so there is no hand-built WireGuard hub left to validate.
Author
Owner

Reopened: the user reviewed the triage on 2026-11-22 and keeps the hub plan. It isn't incompatible with NetBird (iac ADR-0008), and Sveltos is still planned. The superseded close was a parallel session acting on the unreviewed proposal.

Reopened: the user reviewed the triage on 2026-11-22 and keeps the hub plan. It isn't incompatible with NetBird (iac ADR-0008), and Sveltos is still planned. The superseded close was a parallel session acting on the unreviewed proposal.
ginjiruu reopened this issue 2026-11-22 21:38:59 +00:00
Sign in to join this conversation.
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
lab/clusters#1536
No description provided.