routeros: remove legacy VLAN 1000 (PoE switch retired) #149

Closed
opened 2026-11-17 22:30:50 +00:00 by ginjiruu · 1 comment
Owner

After the c1 VLAN-20 window (#140): lab-poesw-01 is retired, so VLAN 1000 has no members. Remove the "1000" network (bridge VLAN, router addresses .252/.253, VRRP gw, DHCP server/pool, zone membership) and the lab-poesw-01 reservation from routeros/modules/site/main.tf. Routers auto-apply on merge: plan it first with a plan-only clone (method on #97), one root at a time.

After the c1 VLAN-20 window (#140): lab-poesw-01 is retired, so VLAN 1000 has no members. Remove the "1000" network (bridge VLAN, router addresses .252/.253, VRRP gw, DHCP server/pool, zone membership) and the lab-poesw-01 reservation from routeros/modules/site/main.tf. Routers auto-apply on merge: plan it first with a plan-only clone (method on #97), one root at a time.
Author
Owner

Done via PR #151 (merged as b0d02ac): site data drops network 1000 and the lab-poesw-01 reservation; runner auto-applied rb5009-a/b and crs309 with the rollback fuse armed and confirmed on rb5009-a. Verified 2026-11-18: 10.10.1.1/.252/.253/.32 no longer answer, legacy-LAN routers (10.15.1.252/.253), VLAN-20 gw (.1) and crs309 mgmt (.10) intact, all three tf objects Applied successfully. render/imports/* left as the historical adoption snapshots (regenerated by render on any future adoption). Note: no branch-planner PR plan ran — the routeros roots are not in the branch-planner resources list yet (#97); plan gate was tofu validate + guard locally.

Done via PR #151 (merged as b0d02ac): site data drops network 1000 and the lab-poesw-01 reservation; runner auto-applied rb5009-a/b and crs309 with the rollback fuse armed and confirmed on rb5009-a. Verified 2026-11-18: 10.10.1.1/.252/.253/.32 no longer answer, legacy-LAN routers (10.15.1.252/.253), VLAN-20 gw (.1) and crs309 mgmt (.10) intact, all three tf objects Applied successfully. render/imports/* left as the historical adoption snapshots (regenerated by render on any future adoption). Note: no branch-planner PR plan ran — the routeros roots are not in the branch-planner resources list yet (#97); plan gate was tofu validate + guard locally.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
lab/iac#149
No description provided.