Hardware: two RB5009UPr+S+IN stacked in the mini rack #44
Labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
lab/iac#44
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Part of lab/iac#43.
Ordered 2026-11-05. This issue is the hardware, the port map, and where nodes land. Config is lab/iac#45. WAN and failover behaviour is lab/iac#46.
Hardware
Port map
Per RB5009.
mini-01 (MS-01).
WAN sits on a 1G port because PPPoE pass-through behind the hub is the binding limit, near 1 Gbps, and ~940 Mbps from a 1G port is under it. This is reversible. If WAN ever stops going through the hub, move it to the 2.5G port and mini's fallback back to a 1G port.
PoE
4 Pis, 2 per router, about 7 W each at 802.3af. Roughly 14 W per router against a 76 W budget. The 2/2 split is not about the budget, it halves how many Pis lose power during a router upgrade. PoE-out is fed from the DC jack or the 2-pin terminal and not from PoE-in, so the 2-pin supply has to be in place for the Pis to come up.
Node placement and etcd
3 voters on the thinks, so quorum is 2. Whichever router carries 2 thinks takes the control plane down with it when it reboots.
Adding Pi voters does not fix this. Split any odd number of voters 2k+1 across 2 routers and the heavier side holds at least k+1, which is quorum, so that router's reboot ends the cluster. It is true at 3, at 5 and at 7. Two failure domains cannot survive losing the heavier one, and an etcd witness would not help either way because witnesses do not vote and k3s has no way to add one.
What does fix it is a third failure domain, and the cheapest version is a second NIC on one think: a USB 3 Ethernet adapter, one link in each router, Linux active-backup. Place the other two thinks one per router. A router reboot then leaves 2 of 3 voters reachable.
Nothing better is available on an M600. The rear optional port is a dedicated display or serial header with no PCIe lanes, so the VGA position leads nowhere. The M.2 Wi-Fi slot does carry PCIe and takes an Intel I210 A+E card, but Lenovo whitelists that slot against a WLAN card list and the RJ45 would have to exit through a chassis vent, which is a poor trade for one link. etcd traffic at this size is negligible, so a USB 3 adapter on an AX88179A or RTL8153 is sufficient. Bond it with miimon so the occasional USB device reset reads as a link flap. The thinks have their own 65 W supplies, so a router reboot drops their link and not their power.
The same argument covers everything else. A Pi can only be a useful voter if it survives a router reboot, which means power from a wall supply rather than PoE, and a NIC in each router.
A different way to get there is to stop tying the API to raft quorum. With an external k3s datastore, the API servers no longer have to be datastore members, so losing a router costs endpoints rather than quorum. That is a datastore migration, so it belongs with the storage rebuild and not with this issue.
Bell hub, and what the 2.5G port is not for
The hub is a Giga Hub 2.0 (Sagemcom, XGS-PON, integrated non-removable ONT). Its ports are 1x 10G, 2x 2.5G and 4x 1G, though Bell's launch coverage claims only two 1G ports. The 10G port is in use today and is capped at 1G by the ER-X-SFP regardless of the plan.
Two things to settle before this layout buys any WAN speed, both tracked in lab/iac#46.
Before the units land
Still to buy
Done when
Addition, 2026-11-05: the CRS309-1G-8S+IN (already owned, idle) as a 10G backplane. It has 8x SFP+ and 1x 1G, passive cooling, and boots RouterOS or SwOS. It won't fit the rack, so it sits beside it.
Layout this enables:
Today's payoff is mostly mini <-> routers. The thinks and Pis are 1G, and WAN is 1.5 Gbps, so the switch pays off as more 10G hosts arrive.
Bell PPPoE findings, 2026-11-06. Covers the "Before the units land" checks.
Measured
The ER-X already runs PPPoE through our Giga Hub 2.0 at line speed. The pass-through cap reported on Bell's forum does not apply to this hub.
Researched
RouterOS WAN, per RB5009
/interface pppoe-clienton the bare WAN port, no VLAN,max-mtu=1492 max-mru=1492,add-default-route=yes,use-peer-dns=yes,keepalive-timeout=30. Clamp MSS (change-tcp-mss=yeson the PPP profile). Avoid the hub's Advanced DMZ: it has a reported drop on every 10-minute DHCP renew.Remaining check
Bring up the second session and confirm both routers hold PPPoE at the same time. This also tests the possible 4-session limit.
All parts are purchased, including the USB 3 NIC and the DACs.
Hardware in hand (2026-11-14): both RB5009UPr+S+IN and the CRS309-1G-8S+IN are here. Still open from this issue: the Bell hub pass-through checks under "Before the units land" (which port passes PPPoE, a speed test above 1G, two sessions at once) and the "Still to buy" list (4x SFP+ DAC, the USB 3 NIC, patch cables). Config work is under #65, tested in the containerlab lab (machine-configs#31).
Hub checks closed by the user (2026-11-15): the Giga Hub carries PPPoE on every LAN port, no pass-through setting needed; plan is 1 Gbit, so no 2.5G speed test. RB5009 throughput at 1 Gbit PPPoE: done in CPU, not hardware (RouterOS has no PPPoE offload); field reports ~940 Mbit/s with ~11% CPU with fasttrack, ~45-50% without. IPv6 is not fasttracked, so v6 load sits nearer the no-fasttrack figure. Still to check at cutover: two PPPoE sessions at once, one per router (two independent edges).
Done by the 2026-11-16 swap. Both RB5009s and the CRS309 are racked, cabled to the port map (iac#122/#123), PoE loads within budget (4 Pis ~7W each, 2 per router), and all three devices were netinstalled, bootstrapped, and adopted by tofu-controller with no drift (iac#129-133). Deviations: mini's bond is active-backup over all four NICs (iac notes 2026-11-16), WAN stays 1G ether2 (Bell PPPoE). Remaining physical wiring (mini enp91s0 fourth link, AP on rb5009-b ether5) tracked as cutover follow-ups.